There’s no need to postpone your drainage repair until spring. Vesiveki’s Kesäkone thaws the ground around your house in about a day, allowing excavation work to proceed smoothly even in freezing temperatures. Once the underground drainage repair is completed in the winter, you can enjoy the Finnish summer without any renovation work.
4 Good Reasons to Repair Your Drainage System in the Winter
Frozen ground protects the yard
. Heavy equipment won’t damage the lawn or leave indentations when the yard is frozen. Because of the frozen ground, the trench next to the foundation remains shallower, as its edges don’t collapse.
Prepare for spring meltwater
The greatest moisture stress occurs when the snow melts. When you complete the renovation in the winter, your home will be ready for spring meltwater.
Get your garden ready for
summer When the renovation is done in the winter, your yard and its plantings will be ready for spring and the new growing season.
Fast turnaround times
You can often get your drainage system renovation done in the winter with very fast turnaround times, since there are more available renovation slots and equipment.
